E2E Inbuilding Project - BT
For this project with BT, we took complete ownership of project management, ensuring all inbuilding sites were delivered efficiently and to specification.
Delivered sites on schedule with minimal rework. Ensured reliable inbuilding coverage for BT.
NTQ Area Management - MBNL
End-to-end delivery of rooftop, greenfield, and street sites across the UK, ensuring continuous network coverage as existing leases reached their end.
Coordinating with stakeholders and contractors.
Succesfully maintained seamless coverage and minimized service disruption for the client.
Activation Management - MBNL
Ensuring all prerequisites are in place before site activation, including transmission configurations, databuild documents, and full access for call testing. This structured approach guaranteed a smooth, first-time-right site activation with minimal delays.
Project Finance Management - BT
Managed £1m+ for the In-building project budgets end-to-end, tracking costs, controlling expenditure, and providing clear financial reporting. PO escalations for additional works and justifiying cost ownership.
Our proactive approach ensures projects stay on budget while delivering maximum value to the client.
For this project with BT, we took complete ownership of project management, ensuring all inbuilding sites were delivered efficiently and to specification.
Coverage Surveys
Arranged coverage surveys to assess existing inbuilding coverage.
Provided justification and proposed solutions to meet minimum coverage requirements.
Coverage report QA and ensuring reporting is produced to client standards.
Design
Design surveys arranged with site contact and engineers.
Liaised with site contact to arrange surveys and agree on design solutions.
Leveraged past experience to identify potential blockers and provide first-time-right designs.
Technical review and QA approval of designs according to SoW.
Build & Coordination
Managed the build alongside BT and other contractors.
Confirmed site requirements: Power, BT transmission, and POI connection points.
Ensured build documents were accurate and accurate for future site visits.
Activation Management
Verified all prerequisites before site attendance: Transmission port configurations, NNF data, and databuild documents.
Coordinated full access to antenna areas for call testing and site commissioning.
SARP document approval and TTO process management.